Green A frame brackets with four hangers
Rated 4.1 of 5249 ratings on the listing

Swing set brackets
Cast in one solid piece with a green finish, these brackets slide over your timber to form the two ends of a yard swing frame.
Rated 4.5 of 518 ratings on the listing
| Material | Galvanized iron, painted |
|---|---|
| Fits | Top beam 5.5 x 3.5 in. actual (4x6 nominal), four legs 3.5 x 3.5 in. actual (4x4 nominal) |
| In the pack | Pair of brackets |
| In the box | Two brackets, 28 bolts and 28 washers |
| Not in the box | Lumber |
| Build time | 30 minutes |
| Goes on | Building an A frame. |
Noted at our retail partner in September 2026. The live listing has the final say.
Yard lumber sits on sawhorses while you line up the top beam. We cast these brackets as solid sleeves with no welded seams or joined corners. Slide your lumber in, drill through the pilot openings, and run the included bolts down with a wrench.
We cast each corner bracket as a single piece of iron. Without welded joints or seams across the angles, the metal stays rigid around the timber ends as the wood settles into the grass.
The green coating covers the iron to shed rain and lawn sprinkler spray. It keeps the metal clean against wet grass and damp soil through summer storms and long winters out in the yard.
The brackets arrive with the mounting bolts and washers you need for the wood. You supply the drill, the socket wrench, and the timber from the local yard to complete the frame.
Slide the brackets onto the top beam first while it rests low. Drill pilot holes through the precast openings, fasten the beam bolts, then insert the four legs before standing the assembly upright.
Rated 4.1 of 5249 ratings on the listing
Rated 4.1 of 5245 ratings on the listing
Green A frame brackets, pair, at our retail partner in a new tab.